CALL US TODAY · (877) 323-8627

We Design, Permit
& Build Your ADU.

100% Focused on ADUs. Not a General Contractor.
We do one thing — and do it better than anyone in Los Angeles.

One accountable team from feasibility through final inspection — no handoffs, no surprises, no cost overruns.

Detached ADUs · Garage Conversions · JADUs · Two-Story ADUs

Schedule a Call
We respond within one business day.

We never share your information.

We'll be in touch!

Thanks for reaching out. Our team will contact you within one business day.

Wondering what your ADU will cost?

Get a detailed estimate in 2 minutes with our free ADU Cost Calculator.

Try the Free Calculator →
Our Approach

Integrated Design-Build.
One Team. Full Accountability.

Building an ADU in Los Angeles requires coordination across zoning, design, engineering, permitting, and construction. ADU Masterminds integrates everything under one roof — one contact, one contract, zero finger-pointing.

1
🔍
Feasibility
& Budget
We evaluate your lot, utilities, zoning, and fire access. You get a locked budget before spending a dollar.
2
✏️
Design &
Architecture
Custom floor plans and elevations tailored to your lot, HOA rules, and existing home style.
3
📋
Permit
Expediting
We submit and manage all plans with LADBS directly. We've done this hundreds of times.
4
🏗️
Construction
Licensed crews build on schedule with pricing locked. Real-time updates, no surprise change orders.
5
🔑
Final Inspection
& Certificate
We handle all city inspections, the punch list, and your certificate of occupancy.
Our Work

Recent ADU Projects

View All Projects →
Common Questions

ADU FAQs for LA Homeowners

How much does it cost to build an ADU in Los Angeles?
ADU costs in LA range from $80,000 to $350,000+ depending on type and finish level. Garage conversions start around $80,000–$130,000. New detached ADUs typically run $150,000–$300,000+. Use our free calculator for a personalized estimate based on your specific project.
What is the setback requirement for an ADU in Los Angeles?
Under California ADU law (Gov. Code 65852.2), ADUs require only 4 ft side and rear setbacks regardless of local zoning — not the 25 ft setbacks that apply to primary dwellings. This applies to all ADU types including detached ADUs and garage conversions.
Do I need a permit to build an ADU in Los Angeles?
Yes — all ADUs require permits from LADBS. However, California state law has made ADU permitting streamlined: most are approved ministerially (by-right) without public hearings or discretionary review. ADU Masterminds handles the entire permitting process for you.
How long does it take to build an ADU in Los Angeles?
Typically 12–18 months total: 2–3 months for design and plans, 3–6 months for LADBS permit approval, and 4–9 months for construction. Garage conversions move faster and can be completed in 8–12 months. We provide a locked schedule before breaking ground.
Can I rent out my ADU in Los Angeles?
Yes. California eliminated owner-occupancy requirements for ADUs in 2020. In the San Fernando Valley, ADUs typically rent for $1,400–$1,700/month (studio), $1,750–$2,200/month (1BR), and $2,200–$2,800/month (2BR). Most clients offset 60–100% of their mortgage payment.
What is a garage conversion ADU?
A garage conversion transforms your existing attached or detached garage into a permitted living unit. It's the most popular ADU type in LA — lower cost, faster to build, and streamlined under state law. A typical 2-car garage (400–500 SF) costs $80,000–$130,000 and rents for $1,500–$1,800/month.
What is a Junior ADU (JADU)?
A JADU is carved from within your existing home — up to 500 SF — and is allowed by-right under California state law on any single-family lot. It requires an efficiency kitchen but can share a bathroom with the main house. JADUs are the lowest-cost ADU option, typically $40,000–$80,000.
Does the ADU cost include an electrical panel upgrade?
Panel upgrades are separate from the base ADU cost. Most LA homes built before 1990 have 100–150 amp service. An ADU with kitchen and laundry typically needs a 200 amp panel upgrade or sub-panel. Budget $6,500–$10,000 for panel work — we confirm your current capacity before permitting.
Resources

ADU Guides & Insights

View All Posts →
Get Started Today
Ready to Build Your ADU?

Free property assessment. No pressure. We'll walk you through what's possible on your lot, what it will cost, and how long it will take.

Call (877) 323-8627 Check My Property →